Shepherd-Durham Major Investment Project – By the Numbers
Phase 1 (15th St to 610)
Funded by $25M in Federal Grant
TIRZ 5 providing local funds
City of Houston providing New Water and Sewer
Phase 2 (I-10 to 15th St)
Funded by $40M in Federal Grants
TIRZ 5 providing local funds
City of Houston providing New Water and Sewer
Project Features

More efficient throughput: By right-sizing the road, the corridor will allow drivers to make fewer maneuvers and in certain places, turn only lanes will be installed to make traffic flow more efficient.

Stormwater Drainage: The project includes adding underground stormwater utilities and allow trees can use stored water long after rain events to more efficiently withstand periods of droughts.

Street and Pedestrian Lights: This project has selected unique street lights that will light up the pedestrian environment using the same street lights.

Trees: The corridor will include thousands of new street trees. The project includes several native species and they will be maintained by Silvia Cells.

Human-Scale Features: The lightning, landscaping and street furniture will foster a sense of community and developments in the area are complementing by building with reduced building setbacks and filling in retail that promotes street activity.

Economic Vibrancy: The corridor has already started to see a significant development growth, with projects that focus on walkability and human-scale development. Shifting from a corridor of high-speed vehicles and land use mostly consisting of used car lots, to a corridor that fosters neighborhood-level activity and promotes mobility, recreation, and economic productivity.

Use the following link to write to the Mayor, his senior staff, our council member, and the 5 at-larges:
Email the Mayor and the Mayor’s Office
If you would prefer to do your letter writing individually, here are the email addresses listed:
Mayor of Houston
Mayor John Whitmire
mayor@houstontx.gov
Chief of Staff
Chris Newport
chris.newport@houstontx.gov
Intergovernmental Relations
Joshua Sanders
joshua.sanders@houstontx.gov
Senior Advisor
Marlene Gafrick
marlene.gafrick@houstontx.gov
Contact our District D council member:
Contact the at-large council members
Call every single office during business hours and ask to leave a message. If they ask you to send an email, insist on leaving a phone message (in addition to sending an email). Make sure they take down your name, phone number, and address.

We printed out 500 postcards to send out to the Mayor. Please feel free to pick some up at Bespoke at 501 W 11th Street during business hours. Please take a selfie prior to mailing out the postcard and send it to us via instagram at @ataleoftwobridges or email it to info@atotb.org.


Want to download the postcard as PDF?

How Many Lanes Does the Shepherd corridor have throughout Houston? Shepherd Drive north of I-610 in Houston, Texas has three lanes for vehicles.

IH-610 to IH-45
Status
No Project Active
Project Sponsor
TxDOT
Vehicle Lanes
3-lanes
Above 15th, where drainage and cross-street work were included, crews are finishing the wide sidewalks intended for pedestrians and bicyclists, separated with raised planters. Work north of 15th is expected to finish this year.

15th Street to IH-610
Status
Under Construction
15th to 20th nearing completion
Project Sponsor
Memorial Heights Redevelopment Authority
Vehicle Lanes
3-lanes Design
Second phase of the MHRA rebuild narrows it to three lanes. The bridge carrying Durham over White Oak Bayou, however, is already three lanes.

IH-10 to 15th Street
Status
100% Design
$40M awarded in Federal Grants
Could be lost if project does not proceed by Sep 2024
Project Sponsor
Memorial Heights Redevelopment Authority
Vehicle Lanes
3-lanes
The street flares to four lanes south of Interstate 10 and remains at four up to Washington Ave.

Washington Ave to IH-10
Status
No Design Yet
Project Sponsor
Possible City of Houston + TIRZ 5
Vehicle Lanes
4-lanes
From Feagan, near Buffalo Bayou, north to Washington Avenue, the streets last year were trimmed to three lanes in each direction with wider sidewalks and a curb-protected bike lane on each.

Memorial Dr to Washington Ave
Status
Construction Complete 2023
Project Sponsor
City of Houston
Vehicle Lanes
3-lanes
South of Buffalo Bayou, Shepherd only carries two lanes in each direction.

US-59 to W Dallas
Status
Segments from Richmond to Westheimer completed 2023
Project Sponsor
Upper Kirby District
Vehicle Lanes
2-lanes